| Building Work : Weyerbach : May - June 2024 |
| ... |
| Day 1 : Tuesday 21 May 2024 |
![]() |
![]() |
|
| 6.45 am Tuesday : the first skip arrives. | Tommy arrives as the skip (for wood only) is unloaded. |
![]() |
![]() |
|
| Building materials are delivered by Brindl the builders. | Lorry mounted crane with extremely long reach brings cement. |
![]() |
![]() |
|
| First skip of scrap wood as well as a tree from the garden. | The garage (with new hole in wall) after the first day. |
![]() |
![]() |
![]() |
| Hole knocked in garage wall on the first day. | Bathroom sink has been removed. | Bathroom radiator has been removed. |
![]() |
![]() |
![]() |
| Old bath tub still in situ. | Breaking up of floor tiles in old heating room. | One of the two windows removed. |
![]() |
![]() |
![]() |
| Second window removed. | More rubble on the floor at end of Day 1. | Window in heating room removed. |
![]() |
![]() |
![]() |
| Tommy on the floor which has been removed | Burned beams in the roof. Looks a bit dodgy! | Ben and Tom with the wood skip on Day 1. |
| ... |
| Day 2: Wednesday 22 May 2024 |
![]() |
![]() |
![]() |
| Work starts on clearing out the old kitchen. | Dodgy looking damp patch under the fridge. | Demolition work up on the chimney. |
![]() |
![]() |
|
| First rubble skip being delivered, before collecting full wood skip. | First rubble skip being positioned next to garage. |
![]() |
![]() |
|
| Carefully laying mat on grass in case anything falls from roof. | GISMO the local window company comes to measure up. |
![]() |
![]() |
|
| Taking down the old chimney from the top to the bottom. | Mary-Ann and Anneliese while the old kitchen is being cleared out. |
![]() |
![]() |
|
| An old stove (one of many) is being transported away. | Mary-Ann and Anneliese inspect the new 'temporary' kitchen. |
![]() |
![]() |
|
| The new 'temporary' kitchen gets a hoovering. | Units from the old kitchen were moved into the 'temporary' kitchen. |
![]() |
![]() |
|
| 'Temporary' kitchen still includes an old mill. | Clearing out all the stuff in the old kitchen. |
| ... |
| Day 3: Thursday 23 May 2024 |
![]() |
![]() |
|
| The ceiling in the old kitchen will need replastering. | Herr Brindl visits to assess and discuss progress. |
![]() |
![]() |
![]() |
| Discussions by the garage. | Old bathroom tub is cleared out. | Wheel-barrow ramp to load the rubble skip. |
![]() |
![]() |
|
| BrindlBau are the local building contractors. | Bags of cement neatly piled up ready for the construction work. |
![]() |
![]() |
|
| That burned roof still looks dodgy. Assessment needed. | Anneliese and Mary-Ann collecting dandelions for the rabbits. |
![]() |
![]() |
|
| The first fully loaded rubble skip is covered up before leaving. | The full first rubble skip is taken away. |
![]() |
![]() |
|
| The lower section of the chimney has been completely removed. | The two windows and the door from the old heating room are gone. |
![]() |
![]() |
![]() |
| Looking UP where the chimney once was. | From the heating room through the garage. | A well used building-site radio. |
| Day 4: Friday 24 May 2024 |
![]() |
![]() |
![]() |
| Herr Brandstetter (kitchen) checks details. | Herrn Brandstetter and Essl (heating). | Internal wall starts to be demolished. |
![]() |
![]() |
![]() |
| Several supports used to hold up ceiling. | The wall next to the garage partially removed. | Ceiling being supported by joists. |
![]() |
![]() |
![]() |
| Four joints in a row in old heating room. | Further part of wall has been removed. | Old heating room being cleared out. |
![]() |
![]() |
![]() |
| Joists in the corner of old heating room. | Dust-sheets are taped across several doors. | Old heating room without any chimney. |
| ... |
| Day 5: Monday 27 May 2024 |
![]() |
![]() |
![]() |
| "Starkstrom" used for some power tools. | Herr Brindl comes to discuss floor etc. | BrindlBau. |
![]() |
![]() |
![]() |
| Mary-Ann inspects the empty bathroom. | Part of the wall already removed. | Mary-Ann and Herr Brindl discuss floor. |
![]() |
![]() |
![]() |
| Closer look at part removed wall. | Herr Brindl joined by assistant. | Demolition work continues. |
![]() |
![]() |
![]() |
| Wiring buried in the brickwork. Not good! | Gismo's dimensions sheet for windows/doors. | Herr Brindl looks at the Gismo dimensions. |
![]() |
![]() |
![]() |
| Inadequate number of joists, says Brindl. | More rubble everywhere. | Measuring width of outer wall. |
![]() |
![]() |
![]() |
| Several people working in old kitchen. | More ceiling joists are rapidly delivered. | The newly bricked up wall/alcove. |
![]() |
![]() |
|
| Brindl brings new materials to site....... | ........ including an air compressor. |
![]() |
![]() |
|
| Unloading materials from the Brindl lorry. | More unloading. |
![]() |
![]() |
![]() |
| Down in the cellar to turn off water (with Dämon chap). | Brickwork around where old chimney was. | Checking the place to the new door. |
![]() |
![]() |
![]() |
| Newly bricked up wall from the other side.. | Downstairs loo still in service. | Mama relaxes away from it all in garden. |
| ... |
| Day 6: Tuesday 28 May 2024 |
![]() |
![]() |
![]() |
| Mary-Ann again arrives early. | Measuring up the levels.... | .... with the green light. |
![]() |
![]() |
![]() |
| Hole dug in the floor in the bathroom. | Another look at the bathroom hole. | Taking a torch to see better. |
![]() |
![]() |
![]() |
| New hole in the former office area. | Herr Brindl draws up details for 31cm flooring. | The edges of the new alcove are concreted. |
![]() |
![]() |
![]() |
| Third inspection hole drilled in floor. | Internal wall begins to be removed. | Third rubble skip is delivered. |
![]() |
![]() |
|
| Skip delivery...... | ....positioning the skip.. |
![]() |
![]() |
|
| Extractor fan hole drilled in wall in new kitchen. | Full skip on lorry. Empty skip hangs on back. |
![]() |
![]() |
|
| Cleared window ledges ............ | ........in the old kitchen. |
![]() |
![]() |
|
| Mary-Ann inspects where wall is being removed. | Tommy looks at hole for a new joist. |
![]() |
![]() |
![]() |
| Tommy with the rubble in the bathroom. | Mama with cup of tea inspecting the wall. | Garage is used for builders' storage. |
![]() |
![]() |
![]() |
| Looking up where old chimney was. | Herr Brindl reduces floor spec from 31cm to 26cm. | There's plenty of rubbish outside. |
![]() |
![]() |
![]() |
| Loads of new joists in place...... | ..... and even more joists | Repeat photo. |
| ... |
| Day 7: Wednesday 29 May 2024 |
![]() |
![]() |
![]() |
| Chimney inspector arrives at 7am. | From Thaler Kamin | Another view of the joists. |
![]() |
![]() |
![]() |
| Joist used at window. | Noise cancelling headhones ... ideal! | Heavy duty "stark-strom" (440v) drill. |
![]() |
![]() |
![]() |
| Upper floor. More walling removed. | Hole in floor down to where chimney was. | Two holes through the ceiling. |
![]() |
![]() |
![]() |
| The next skip is gradually filled up. | Mary-Ann climbs ladder to access the up-stairs area. | Measuring thickness( 31cm) of the (new) shack wall. |
![]() |
![]() |
|
| Gismo turns up to check window dimenions will still be OK. | More joists. |
![]() |
![]() |
![]() |
| Tommy works on his tree-house. | The small vent on the roof is not new, apparently. | Repeat photo. |
| ... |
| Day 8: Monday 3 June 2024 |
![]() |
![]() |
![]() |
| Wet start to Monday morning | Only two workers turn up ..... | ..... not enough to do for more. |
![]() |
![]() |
![]() |
| The concrete floor in the old kitchen ..... | ..... is being dug up with a pneumatic drill. | Also more digging in the new office area. |
![]() |
![]() |
![]() |
| Piles of concrete rubble .... | ....more concrete rubble.... | Bathroom floor almost all dug up. |
| ... |
| Day 9: Tuesday 4 June 2024 |
![]() |
![]() |
![]() |
| Generator arrives a day too early. | Kaminbauer on the blower..... | ...... Kaminbauer still on the blower. |
![]() |
![]() |
|
| Second Brindl van ... bringing the stand-in for Herr Brindl. | Large gaps appearing above the windows. |
![]() |
![]() |
![]() |
| Herr Essl looking for heating pipes. | More floor starts to be taken up. | Herr Essl looks at the underfloor heating. |
![]() |
![]() |
![]() |
| The shack window is being widened. | New brickwork at the widened shack window. | An old heating stove ready to be removed. |
![]() |
![]() |
|
| Herr Essl brings a posh looking book with bathroom plans. | Further work on the rear windows. |
![]() |
![]() |
|
| Expanded shack window and holes ready for the steel girders. | A closer view of the rear windows |
![]() |
![]() |
|
| Compressor for use with the pneumatic drill. | More joists. |
![]() |
![]() |
![]() |
| Concrete mixer. | New brickwork seen from inside. | More rubble and joists. |
![]() |
![]() |
![]() |
| More rubble. | Old floor being removed. | New brickwork at top of window. |
| ... |
| Day 10: Wednesday 5 June 2024 |
![]() |
![]() |
![]() |
| Crane delivers girders. | Tying on the old wood burner heater. | Steel gairders for downstairs. |
![]() |
![]() |
|
| Crane ready to pick up the old heater from upstairs, | Girders being delivered. |
![]() |
![]() |
![]() |
| Remote controlled crane. | Remote controlled crane. | Lifting a girder for upstairs. |
![]() |
![]() |
![]() |
| Mama looks at the old heater. | More materials being delivered | Insulation and other materials. |
![]() |
![]() |
|
| The girder is in place before the last part of outer wall removed. | The last part of the outer wall is almost removed. |
![]() |
![]() |
![]() |
| Steel girder. | View out towards the garage | View out towards the garage |
![]() |
![]() |
|
| New indoor girder installed with insulating material | New girder over where the door will. Also got insulation. |
![]() |
![]() |
|
| Two girders are next to each other. | New girder in place. |
![]() |
![]() |
|
| Girder on top of girder over extended shack window. | Girders put in place over new door. |
![]() |
![]() |
|
| The steel girder fitted over where the sliding door will be. | The steel girder fitted over where the sliding door will be. |
| ... |
| Day 11: Thursday 6 June 2024 |
![]() |
![]() |
|
| New skip delivered -- for concrete. | Third rubble skip is collected. |
![]() |
![]() |
|
| As seen through fly screen (blurred!) : third rubble skip is removed. | The newly delivered skip is for concrete ---taking up the floors. |
![]() |
![]() |
![]() |
| It's MAGNUM time all round. | Tommy by the extended shack window. | No generator on truck (only for two days). |
![]() |
![]() |
|
| Tommy at the cement mixer. | The newly expanded shack window takes shape. |
![]() |
![]() |
|
| The old heater from upstairs awaiting collection. | Tommy starts to cut the grass in the field. . |
| ... |
| Day 12: Friday 7 June 2024 |
![]() |
![]() |
|
| Arriving an old banger with a O-xxxxxx registration. | Upstairs : brickwork at floor level to door with the door below. |
![]() |
![]() |
![]() |
| Note the ancient O 654 688 number plate! | Upstairs where the chimney used to be. | Inspecting the upstairs area. |
![]() |
![]() |
|
| Supporting girders in ceiling upstairs. | Supporting girders in ceiling upstairs. |
![]() |
![]() |
|
| Looking down through the hole in floor from upstairs. | View out over the upstairs balcony (without a railing). |
![]() |
![]() |
|
| Upstairs window out onto the vegetable patch. | Upstairs window out onto the vegetable patch. |
![]() |
![]() |
|
| Upstairs window. | Upstairs window. |
![]() |
![]() |
![]() |
| Upstairs hole in the floor. | What is this above where the oil tank was? | View out from the balcony. |
![]() |
![]() |
![]() |
| Upstairs. | Upstairs. | Upstairs. |
![]() |
![]() |
![]() |
| Upstairs. | Upstairs. | The new skip (for concrete etc). |
![]() |
![]() |
![]() |
| Garden view with cement mixer. | Garden view. | View from rear through to garage. |
![]() |
![]() |
|
| Expanded work on the rare window for Jalousie. | Progress on the back of the house. |
| ... |
| Day 13: Monday 10 June 2024 |
![]() |
![]() |
|
| The old clapped out VW van (O.xxxxxx) is used for the third day. | Progress on the back of the house. |
![]() |
![]() |
|
| A pause outside on the drive between the fifth and sixth skips. | All the joists have now gone. |
![]() |
![]() |
![]() |
| New shack window from the outside. | Working on cementing around the window. | The new skip (second for concrete ). |
![]() |
![]() |
|
| Second concrete (6th overall) skip is delivered. | Progress in the new lounge/shack area. |
![]() |
![]() |
![]() |
| The second concrete (6th overall) skip. | The space for the new shack window. | The new lounge area. |
![]() |
![]() |
![]() |
| Newly concreted. | Sliding door area. | Bathroom floor not fully up. Loo still there. |
![]() |
![]() |
![]() |
| Bathroom floor. | Sliding door space. | Sliding door space. |
![]() |
![]() |
|
| Sliding door's frame seen from the outside. | Gaps for sliding door and the window. |
![]() |
![]() |
|
| View through where the new sliding door will go. | Ditto. |
![]() |
![]() |
![]() |
| The second concrete skip starts to be used.. | Kitchen floor up. | Kitchen floor up. |
![]() |
![]() |
![]() |
| Kitchen floor up. | Kitchen floor up. | Kitchen floor up. |
| ... |
| Day 14: Tuesday 11 June 2024 |
![]() |
![]() |
|
| Herr Brindel does a site visit (after his week off). | Simon putting in insulation. |
![]() |
![]() |
![]() |
| The floor being taken up : very dusty work! | Fitting insulation to window. | The floor being taken up. Very dusty work. |
![]() |
![]() |
![]() |
| Working outside. | Herr Brindl looks at his "26 cm" diagram. | Pipes on the floor in the bathroom. |
![]() |
![]() |
![]() |
| Mary-Ann and Mr Brindl discuss bathroom. | Concrete skip slowly being filled. | Herr Brindl's car.. |
![]() |
![]() |
|
| Looking out to garden | Using the "green line" level measurer. |
![]() |
![]() |
|
| Putting the ladder in place. | Lid off the compressor - something wrong here? |
![]() |
![]() |
![]() |
| Mary-Ann climbs up to inspect first floor. | Impression in driveway left by skip truck. | Measuring levels in the new kitchen. |
![]() |
![]() |
![]() |
| Mary-Ann and Herr Brindl discuss flooring. | What best to do with the various floor levels? | Measuring levels. |
![]() |
![]() |
![]() |
| The usual BrindlBau truck is back. | The new window in the shack. | The window in the shack with GMDX mug. |
![]() |
![]() |
|
| Something up with the compressor? | The shack mains feed comes through the ceiling. |
![]() |
![]() |
|
| The gap for the sliding door/window. | Ditto ....The gap for the sliding door/window. |
![]() |
![]() |
![]() |
| Nicely finished window frame. | Mary-Ann calls Bodenleger Winetzhammer. | GMDX mug looks at the new shack. |
![]() |
![]() |
![]() |
| Wheel barrow for the rubble. | New Porta-Loo arrives. | Concrete in the skip (being collected Wed). |
| ... |
| Day 15: Wednesday 12 June 2024 |
![]() |
![]() |
![]() |
| Dämon removes old radiator in kitchen. | Compressors being swapped over. | Compressors being swapped over. |
![]() |
![]() |
|
| Replacement compressor delivered by truck with the onboard crane. | Sixth skip is collected. |
![]() |
![]() |
![]() |
| Herr Essl looks at pipework in old kitchen. | Essl and plumber look for pipework upstairs. | Sixth skip (concrete) is taken away. |
![]() |
![]() |
|
| Getting ready to lift up the (partially) full skip. | Second day with a portaloo on site. |
![]() |
![]() |
![]() |
| Dämon plumbers arrive 8am. | Temporary water pipe fitted in old bathroom. | Loo in the old bathroom finally removed. |
![]() |
![]() |
|
| The empty seventh skip is delivered. | Ditto .... empty seventh skip is delivered. |
![]() |
![]() |
![]() |
| Partially dug out floor by the old back door. | Partially dug out floor in the new shack area. | Partially dug out floor in the shack corner. |
![]() |
![]() |
![]() |
| Anneliese doing a tea-time site inspection. | Bottles of "Ohne" water are left out for use. | The seventh skip is already filling up. |
![]() |
![]() |
|
| The newly expanded shack window to the north-east. | Shack window to the south-east. |
![]() |
![]() |
|
| Looking out the new big sliding door / window. | The blocked-off alcove and partially dug-out floor. |
![]() |
![]() |
|
| The green house looks a bit tiny. Maybe we need a bigger one? | Further work done on the beams over both the door and window. |
![]() |
![]() |
|
| The new shack corner on right. Still more digging out to be done. | Hole through to the floor above is still there. |
| ... |
| Day 16: Thursday 13 June 2024 |
![]() |
![]() |
![]() |
| Floor in the new shack. | Between shack and garage. | Old garage wall. |
![]() |
![]() |
![]() |
| Old under floor radiator pipes out. | Under floor radiator removed. | Base of door - large window. |
![]() |
![]() |
|
| Bathroom floor. | Space for large new window and door. |
![]() |
![]() |
![]() |
| Not sure where this is!. | Outside the sealed off bedroom door. | Around the base of the new large window. |
![]() |
![]() |
![]() |
| Alcove area. | Door into the old lounge. | Door into the old lounge. |
![]() |
![]() |
![]() |
| Skip. | Skip. | New enlarged shack window. |
![]() |
![]() |
|
| The new shack area before new wall goes up. | New shack area. |
![]() |
![]() |
|
| Looking towards the old lounge door. | Door in the old offoce area. |
![]() |
![]() |
|
| Floor in the old office area. | Looking towards the bathroom. |
![]() |
![]() |
![]() |
| Kachelofen. | Bathroom floor. | Bathroom floor. |
![]() |
![]() |
|
| Bathroom floor with new pipes underground. | Not sure what this is!. |
![]() |
![]() |
![]() |
| Mystery pipe -- where is this?. | Wall between kachelofen and bathroom. | Temporary pipework in bathroom. |
![]() |
![]() |
![]() |
| Temporary pipework in bathroom. | Floor in the new lounge area. | Electrical feed (will be for shack). |
![]() |
![]() |
|
| Floor in corner of shack area. | Floor by the new large door. |
![]() |
![]() |
|
| The girder in the shack ceiling. | The girder in the shack ceiling. |
| ... |
| Day 23: Tuesday 25 June 2024 |
![]() |
![]() |
![]() |
| Mary-Ann arrives for another day on site. | Looking at the new shack alcove area. | Bathroom floor now concreted. |
![]() |
![]() |
![]() |
| Materials for the new false ceiling. | Mary-Ann in new lounge area. | Brandstetter brings bit for bedroom door. |
![]() |
![]() |
|
| Two vans : Lecky and Brandstetter. | Brandstetter talks to Simon re bedroom door. |
![]() |
![]() |
|
| Items for the electrician. | Site meeting : Mary-Ann, Simon, Brandstetter + Lehrling. |
![]() |
![]() |
![]() |
| Brandstetter explains new bathroom door. | Upstairs : mystery pipe still there. | Upstairs : view through window. |
![]() |
![]() |
|
| Brindlbau truck. | Busy in new kitchen : Lecky, Brandstetter and Mary-Ann. |
![]() |
![]() |
|
| The ceilings are not horizontal. False ceiling needed. | See thin horizontal line near ceiling. It's all wonky. |
![]() |
![]() |
![]() |
| Mary-Ann examines lounge floor area. | View from upstairs balcony. | Electrical socket holes in new kitchen. |
![]() |
![]() |
|
| Upstairs : chimney gap in ceiling concreted. | Upstairs : chimney gap in floor concreted. |
![]() |
![]() |
![]() |
| Holes drilled for electrical cables. | Kitchen : power sockets will be here. | Kitchen : drilling in wall. |
![]() |
![]() |
![]() |
| Kitchen. | Kitchen. | Looking out of kitchen door. |
![]() |
![]() |
![]() |
| Another skip is filling up. | Garage no longer accessible internally. | Garage. |
![]() |
![]() |
|
| New insulation on internal garage wall. | New insulation on internal garage wall. |
![]() |
![]() |
![]() |
| Piles more rubbish outside. | Rubbish outside. | Twelve power sockets in shack alcove. |
![]() |
![]() |
|
| The old chimney space has been concreted. | False ceiling to cover up burnt wood. |
![]() |
![]() |
|
| False ceiling to cover up burnt wood. | Master switch and twelve power outlets in shack. |
![]() |
![]() |
|
| The new shack area with window and wall sockets. | The new large door will go here. |
![]() |
![]() |
|
| Rear view ..... | Ditto..... |
![]() |
![]() |
![]() |
| Corner in new shack. | Old door to downstairs bedroom. | More drilling in walls for cable runs. |
![]() |
![]() |
![]() |
| Two chimneys are being closed off. | Looking from bathroom to old office area. | Electricians tools ready for the next day. |
| ... |
| Day 34: Thursday 11 July 2024 |
| Outside View |
![]() |
![]() |
![]() |
| Outside front. | Outside front. | Garage and cement delivered for screed. |
| Garage |
![]() |
![]() |
![]() |
| Inside the garage. | Inside the garage. | Inside the garage. |
![]() |
![]() |
![]() |
| Inside the garage. | Cement delivered for the screed. | Piles of junk round the back to be collected. |
| Outside Back and Side |
![]() |
![]() |
![]() |
| Piles of junk still to be collected. | Space where the large window/door will go. | Space for the large window/door. |
![]() |
![]() |
|
| Spaces for windows. | Window for new shack. | Blank. |
| New Shack Area |
![]() |
![]() |
![]() |
| New shack area : sockets on wall. | New shack area : side window. | New shack area : wall sockets. |
![]() |
![]() |
![]() |
| New shack area : wall sockets. | New shack area : side window. | New shack area : four cable feed-throughs. |
![]() |
![]() |
![]() |
| New shack area. | New shack area : window out to garden. | New shack area. |
| New Living Room |
![]() |
![]() |
![]() |
| New living room area. | New living room area. | New living room area. |
![]() |
![]() |
![]() |
| New living room area : looking towards shack | New living room area. | New living room area. |
![]() |
![]() |
|
| New living room area. | New living room area : old bedroom door. | Blank. |
| New Bath Room |
![]() |
![]() |
![]() |
| New bathroom. | New bathroom. | New bathroom. |
![]() |
![]() |
![]() |
| New bathroom. | New bathroom. | New bathroom. |
![]() |
||
| New bathroom. | Blank. | Blank. |
| Old Office area outside New Bath Room |
![]() |
![]() |
![]() |
| Old office area outside bathroom. | Old office area : looking towards bathroom. | Old office area outside bathroom. |
![]() |
![]() |
![]() |
| Old office area outside bathroom. | Old office area outside bathroom. | Mixer system for underfloor heating. |
![]() |
![]() |
![]() |
| Old office area outside bathroom. | Old office area outside bathroom. | Old office area outside bathroom. |
| New Kitchen |
![]() |
![]() |
![]() |
| New kitchen. | New kitchen. | New kitchen. |
![]() |
![]() |
|
| New kitchen. | New kitchen. | Blank. |