Building Work : Weyerbach : May - June 2024
... 
Day 1 : Tuesday 21 May 2024
pic 2   pic 2
6.45 am Tuesday : the first skip arrives. Tommy arrives as the skip (for wood only) is unloaded.
pic 2   pic 2
Building materials are delivered by Brindl the builders. Lorry mounted crane with extremely long reach brings cement.
pic 2   pic 2
First skip of scrap wood as well as a tree from the garden. The garage (with new hole in wall) after the first day.
pic 2 pic 2 pic 2
Hole knocked in garage wall on the first day.  Bathroom sink has been removed. Bathroom radiator has been removed.
pic 2 pic 2 pic 2
Old bath tub still in situ. Breaking up of floor tiles in old heating room. One of the two windows removed.
pic 2 pic 2 pic 2
Second window removed.  More rubble on the floor at end of Day 1.  Window in heating room removed.
pic 2 pic 2 pic 2
Tommy on the floor which has been removed  Burned beams in the roof. Looks a bit dodgy!  Ben and Tom with the wood skip on Day 1.  
...
Day 2: Wednesday 22 May 2024
pic 2 pic 2 pic 2
Work starts on clearing out the old kitchen.  Dodgy looking damp patch under the fridge.  Demolition work up on the chimney. 
pic 2   pic 2
First rubble skip being delivered, before collecting full wood skip.   First rubble skip being positioned next to garage.
pic 2   pic 2
Carefully laying mat on grass in case anything falls from roof.   GISMO the local window company comes to measure up.
pic 2   pic 2
Taking down the old chimney from the top to the bottom.   Mary-Ann and Anneliese while the old kitchen is being cleared out.
pic 2   pic 2
An old stove (one of many) is being transported away.   Mary-Ann and Anneliese inspect the new 'temporary' kitchen.
pic 2   pic 2
The new 'temporary' kitchen gets a hoovering.   Units from the old kitchen were moved into the 'temporary' kitchen.
pic 2   pic 2
'Temporary' kitchen still includes an old mill.   Clearing out all the stuff in the old kitchen.
...
Day 3: Thursday 23 May 2024
pic 2   pic 2
The ceiling in the old kitchen will need replastering.   Herr Brindl visits to assess and discuss progress.
pic 2 pic 2 pic 2
Discussions by the garage.  Old bathroom tub is cleared out.  Wheel-barrow ramp to load the rubble skip. 
pic 2   pic 2
BrindlBau are the local building contractors.   Bags of cement neatly piled up ready for the construction work.
pic 2   pic 2
That burned roof still looks dodgy. Assessment needed.   Anneliese and Mary-Ann collecting dandelions for the rabbits.
pic 2   pic 2
The first fully loaded rubble skip is covered up before leaving.   The full first rubble skip is taken away.
pic 2   pic 2
The lower section of the chimney has been completely removed.   The two windows and the door from the old heating room are gone.
pic 2 pic 2 pic 2
Looking UP where the chimney once was. From the heating room through the garage.  A well used building-site radio.
Day 4: Friday 24 May 2024
pic 2 pic 2 pic 2
Herr Brandstetter (kitchen) checks details. Herrn Brandstetter and Essl (heating).  Internal wall starts to be demolished.
pic 2 pic 2 pic 2
Several supports used to hold up ceiling. The wall next to the garage partially removed.  Ceiling being supported by joists.
pic 2 pic 2 pic 2
Four joints in a row in old heating room. Further part of wall has been removed. Old heating room being cleared out.
pic 2 pic 2 pic 2
Joists in the corner of old heating room. Dust-sheets are taped across several doors.  Old heating room without any chimney.
...
Day 5: Monday 27 May 2024
pic 2 pic 2 pic 2
"Starkstrom" used for some power tools. Herr Brindl comes to discuss floor etc. BrindlBau.
pic 2 pic 2 pic 2
Mary-Ann inspects the empty bathroom. Part of the wall already removed. Mary-Ann and Herr Brindl discuss floor.
pic 2 pic 2 pic 2
Closer look at part removed wall. Herr Brindl joined by assistant. Demolition work continues.
pic 2 pic 2 pic 2
Wiring buried in the brickwork. Not good! Gismo's dimensions sheet for windows/doors. Herr Brindl looks at the Gismo dimensions.
pic 2 pic 2 pic 2
Inadequate number of joists, says Brindl. More rubble everywhere. Measuring width of outer wall.
pic 2 pic 2 pic 2
Several people working in old kitchen. More ceiling joists are rapidly delivered. The newly bricked up wall/alcove.
pic 2   pic 2
Brindl brings new materials to site....... ........ including an air compressor.
pic 2   pic 2
Unloading materials from the Brindl lorry. More unloading.
pic 2 pic 2 pic 2
Down in the cellar to turn off water (with Dämon chap). Brickwork around where old chimney was. Checking the place to the new door.
pic 2 pic 2 pic 2
Newly bricked up wall from the other side.. Downstairs loo still in service. Mama relaxes away from it all in garden.
...
Day 6: Tuesday 28 May 2024
pic 2 pic 2 pic 2
Mary-Ann again arrives early. Measuring up the levels.... .... with the green light.
pic 2 pic 2 pic 2
Hole dug in the floor in the bathroom. Another look at the bathroom hole. Taking a torch to see better.
pic 2 pic 2 pic 2
New hole in the former office area. Herr Brindl draws up details for 31cm flooring. The edges of the new alcove are concreted.
pic 2 pic 2 pic 2
Third inspection hole drilled in floor. Internal wall begins to be removed. Third rubble skip is delivered.
pic 2   pic 2
Skip delivery...... ....positioning the skip..
pic 2   pic 2
Extractor fan hole drilled in wall in new kitchen. Full skip on lorry. Empty skip hangs on back.
pic 2   pic 2
Cleared window ledges ............ ........in the old kitchen.
pic 2   pic 2
Mary-Ann inspects where wall is being removed. Tommy looks at hole for a new joist.
pic 2 pic 2 pic 2
Tommy with the rubble in the bathroom. Mama with cup of tea inspecting the wall. Garage is used for builders' storage.
pic 2 pic 2 pic 2
Looking up where old chimney was. Herr Brindl reduces floor spec from 31cm to 26cm. There's plenty of rubbish outside.
pic 2 pic 2 pic 2
Loads of new joists in place...... ..... and even more joists Repeat photo.
...
Day 7: Wednesday 29 May 2024
pic 2 pic 2 pic 2
Chimney inspector arrives at 7am. From Thaler Kamin Another view of the joists.
pic 2 pic 2 pic 2
Joist used at window. Noise cancelling headhones ... ideal! Heavy duty "stark-strom" (440v) drill.
pic 2 pic 2 pic 2
Upper floor. More walling removed. Hole in floor down to where chimney was. Two holes through the ceiling.
pic 2 pic 2 pic 2
The next skip is gradually filled up. Mary-Ann climbs ladder to access the up-stairs area. Measuring thickness( 31cm) of the (new) shack wall.
pic 2   pic 2
Gismo turns up to check window dimenions will still be OK. More joists.
pic 2 pic 2 pic 2
Tommy works on his tree-house. The small vent on the roof is not new, apparently. Repeat photo.
...
Day 8: Monday 3 June 2024
pic 2 pic 2 pic 2
Wet start to Monday morning    Only two workers turn up .....  ..... not enough to do for more. 
pic 2 pic 2 pic 2
The concrete floor in the old kitchen ..... ..... is being dug up with a pneumatic drill.  Also more digging in the new office area. 
pic 2 pic 2 pic 2
Piles of concrete rubble ....  ....more concrete rubble.... Bathroom floor almost all dug up.
...
Day 9: Tuesday 4 June 2024
pic 2 pic 2 pic 2
Generator arrives a day too early.  Kaminbauer on the blower..... ...... Kaminbauer still on the blower.
pic 2   pic 2
Second Brindl van ... bringing the stand-in for Herr Brindl. Large gaps appearing above the windows.
pic 2 pic 2 pic 2
Herr Essl looking for heating pipes.  More floor starts to be taken up. Herr Essl looks at the underfloor heating.
pic 2 pic 2 pic 2
The shack window is being widened.  New brickwork at the widened shack window. An old heating stove ready to be removed.
pic 2   pic 2
Herr Essl brings a posh looking book with bathroom plans. Further work on the rear windows.
pic 2   pic 2
Expanded shack window and holes ready for the steel girders. A closer view of the rear windows 
pic 2   pic 2
Compressor for use with the pneumatic drill. More joists.
pic 2 pic 2 pic 2
Concrete mixer. New brickwork seen from inside. More rubble and joists.
pic 2 pic 2 pic 2
More rubble. Old floor being removed. New brickwork at top of window.
...
Day 10: Wednesday 5 June 2024
pic 2 pic 2 pic 2
Crane delivers girders.  Tying on the old wood burner heater.  Steel gairders for downstairs. 
pic 2   pic 2
Crane ready to pick up the old heater from upstairs,   Girders being delivered.  
pic 2 pic 2 pic 2
Remote controlled crane. Remote controlled crane. Lifting a girder for upstairs.
pic 2 pic 2 pic 2
Mama looks at the old heater. More materials being delivered  Insulation and other materials.  
pic 2   pic 2
The girder is in place before the last part of outer wall removed.  The last part of the outer wall is almost removed. 
pic 2 pic 2 pic 2
Steel girder. View out towards the garage  View out towards the garage 
pic 2   pic 2
New indoor girder installed with insulating material   New girder over where the door will. Also got insulation.   
pic 2   pic 2
Two girders are next to each other.  New girder in place.
pic 2   pic 2
Girder on top of girder over extended shack window.   Girders put in place over new door. 
pic 2   pic 2
The steel girder fitted over where the sliding door will be. The steel girder fitted over where the sliding door will be.
...
Day 11: Thursday 6 June 2024
pic 2   pic 2
New skip delivered -- for concrete. Third rubble skip is collected.
pic 2   pic 2
As seen through fly screen (blurred!) : third rubble skip is removed. The newly delivered skip is for concrete ---taking up the floors.
pic 2 pic 2 pic 2
It's MAGNUM time all round. Tommy by the extended shack window. No generator on truck (only for two days).
pic 2   pic 2
Tommy at the cement mixer. The newly expanded shack window takes shape.
pic 2   pic 2
The old heater from upstairs awaiting collection. Tommy starts to cut the grass in the field.          .
...
Day 12: Friday 7 June 2024
pic 2   pic 2
Arriving an old banger with a O-xxxxxx registration. Upstairs : brickwork at floor level to door with the door below.
pic 2 pic 2 pic 2
Note the ancient O 654 688 number plate! Upstairs where the chimney used to be. Inspecting the upstairs area.
pic 2   pic 2
Supporting girders in ceiling upstairs. Supporting girders in ceiling upstairs.
pic 2   pic 2
Looking down through the hole in floor from upstairs. View out over the upstairs balcony (without a railing).
pic 2   pic 2
Upstairs window out onto the vegetable patch. Upstairs window out onto the vegetable patch.
pic 2   pic 2
Upstairs window. Upstairs window.
pic 2 pic 2 pic 2
Upstairs hole in the floor. What is this above where the oil tank was? View out from the balcony.
pic 2 pic 2 pic 2
Upstairs. Upstairs. Upstairs.
pic 2 pic 2 pic 2
Upstairs. Upstairs. The new skip (for concrete etc).
pic 2 pic 2 pic 2
Garden view with cement mixer. Garden view. View from rear through to garage.
pic 2   pic 2
Expanded work on the rare window for Jalousie. Progress on the back of the house.
...
Day 13: Monday 10 June 2024
pic 2   pic 2
The old clapped out VW van (O.xxxxxx) is used for the third day. Progress on the back of the house.
pic 2   pic 2
A pause outside on the drive between the fifth and sixth skips. All the joists have now gone.
pic 2 pic 2 pic 2
New shack window from the outside. Working on cementing around the window. The new skip (second for concrete ).
pic 2   pic 2
Second concrete (6th overall) skip is delivered. Progress in the new lounge/shack area.
pic 2 pic 2 pic 2
The second concrete (6th overall) skip. The space for the new shack window. The new lounge area.
pic 2 pic 2 pic 2
Newly concreted. Sliding door area. Bathroom floor not fully up. Loo still there.
pic 2 pic 2 pic 2
Bathroom floor. Sliding door space. Sliding door space.
pic 2   pic 2
Sliding door's frame seen from the outside. Gaps for sliding door and the window.
pic 2   pic 2
View through where the new sliding door will go. Ditto.
pic 2 pic 2 pic 2
The second concrete skip starts to be used.. Kitchen floor up. Kitchen floor up.
pic 2 pic 2 pic 2
Kitchen floor up. Kitchen floor up. Kitchen floor up.
...
Day 14: Tuesday 11 June 2024
pic 2   pic 2
Herr Brindel does a site visit (after his week off). Simon putting in insulation.
pic 2 pic 2 pic 2
The floor being taken up : very dusty work! Fitting insulation to window. The floor being taken up. Very dusty work.
pic 2 pic 2 pic 2
Working outside. Herr Brindl looks at his "26 cm" diagram. Pipes on the floor in the bathroom.
pic 2 pic 2 pic 2
Mary-Ann and Mr Brindl discuss bathroom. Concrete skip slowly being filled. Herr Brindl's car..
pic 2   pic 2
Looking out to garden  Using the "green line" level measurer.
pic 2   pic 2
Putting the ladder in place. Lid off the compressor - something wrong here?
pic 2 pic 2 pic 2
Mary-Ann climbs up to inspect first floor. Impression in driveway left by skip truck. Measuring levels in the new kitchen.
pic 2 pic 2 pic 2
Mary-Ann and Herr Brindl discuss flooring. What best to do with the various floor levels? Measuring levels.
pic 2 pic 2 pic 2
The usual BrindlBau truck is back. The new window in the shack. The window in the shack with GMDX mug.
pic 2   pic 2
Something up with the compressor? The shack mains feed comes through the ceiling.
pic 2   pic 2
The gap for the sliding door/window. Ditto ....The gap for the sliding door/window.
pic 2 pic 2 pic 2
Nicely finished window frame. Mary-Ann calls Bodenleger Winetzhammer. GMDX mug looks at the new shack.
pic 2 pic 2 pic 2
Wheel barrow for the rubble. New Porta-Loo arrives. Concrete in the skip (being collected Wed).
...
Day 15: Wednesday 12 June 2024
pic 2 pic 2 pic 2
Dämon removes old radiator in kitchen. Compressors being swapped over. Compressors being swapped over.
pic 2   pic 2
Replacement compressor delivered by truck with the onboard crane. Sixth skip is collected.
pic 2 pic 2 pic 2
Herr Essl looks at pipework in old kitchen. Essl and plumber look for pipework upstairs. Sixth skip (concrete) is taken away.
pic 2   pic 2
Getting ready to lift up the (partially) full skip. Second day with a portaloo on site.
pic 2 pic 2 pic 2
Dämon plumbers arrive 8am. Temporary water pipe fitted in old bathroom. Loo in the old bathroom finally removed.
pic 2   pic 2
The empty seventh skip is delivered. Ditto .... empty seventh skip is delivered.
pic 2 pic 2 pic 2
Partially dug out floor by the old back door. Partially dug out floor in the new shack area. Partially dug out floor in the shack corner.
pic 2 pic 2 pic 2
Anneliese doing a tea-time site inspection. Bottles of "Ohne" water are left out for use. The seventh skip is already filling up.
pic 2   pic 2
The newly expanded shack window to the north-east. Shack window to the south-east.
pic 2   pic 2
Looking out the new big sliding door / window. The blocked-off alcove and partially dug-out floor.
pic 2   pic 2
The green house looks a bit tiny. Maybe we need a bigger one? Further work done on the beams over both the door and window.
pic 2   pic 2
The new shack corner on  right. Still more digging out to be done. Hole through to the floor above is still there.
...
Day 16: Thursday 13 June 2024
pic 2 pic 2 pic 2
Floor in the new shack. Between shack and garage. Old garage wall.
pic 2 pic 2 pic 2
Old under floor radiator pipes out. Under floor radiator removed. Base of door - large window.
pic 2   pic 2
Bathroom floor. Space for large new window and door.
pic 2 pic 2 pic 2
Not sure where this is!. Outside the sealed off bedroom door. Around the base of the new large window.
pic 2 pic 2 pic 2
Alcove area. Door into the old lounge. Door into the old lounge.
pic 2 pic 2 pic 2
Skip. Skip. New enlarged shack window.
pic 2   pic 2
The new shack area before new wall goes up. New shack area.
pic 2   pic 2
Looking towards the old lounge door. Door in the old offoce area.
pic 2   pic 2
Floor in the old office area. Looking towards the bathroom.
pic 2 pic 2 pic 2
Kachelofen. Bathroom floor. Bathroom floor.
pic 2   pic 2
Bathroom floor with new pipes underground. Not sure what this is!.
pic 2 pic 2 pic 2
Mystery pipe -- where is this?. Wall between kachelofen and bathroom. Temporary pipework in bathroom.
pic 2 pic 2 pic 2
Temporary pipework in bathroom. Floor in the new lounge area. Electrical feed (will be for shack).
pic 2   pic 2
Floor in corner of shack area. Floor by the new large door.
pic 2   pic 2
The girder in the shack ceiling. The girder in the shack ceiling.
...
Day 23: Tuesday 25 June 2024
pic 2 pic 2 pic 2
Mary-Ann arrives for another day on site. Looking at the new shack alcove area. Bathroom floor now concreted.
pic 2 pic 2 pic 2
Materials for the new false ceiling. Mary-Ann in new lounge area. Brandstetter brings bit for bedroom door.
pic 2   pic 2
Two vans : Lecky and Brandstetter. Brandstetter talks to Simon re bedroom door.
pic 2   pic 2
Items for the electrician. Site meeting : Mary-Ann, Simon, Brandstetter + Lehrling.
pic 2 pic 2 pic 2
Brandstetter explains new bathroom door. Upstairs : mystery pipe still there. Upstairs : view through window.
pic 2   pic 2
Brindlbau truck. Busy in new kitchen : Lecky, Brandstetter and Mary-Ann.
pic 2   pic 2
The ceilings are not horizontal. False ceiling needed. See thin horizontal line near ceiling. It's all wonky.
pic 2 pic 2 pic 2
Mary-Ann examines lounge floor area. View from upstairs balcony. Electrical socket holes in new kitchen.
pic 2   pic 2
Upstairs : chimney gap in ceiling concreted. Upstairs : chimney gap in floor concreted.
pic 2 pic 2 pic 2
Holes drilled for electrical cables. Kitchen : power sockets will be here. Kitchen : drilling in wall.
pic 2 pic 2 pic 2
Kitchen. Kitchen. Looking out of kitchen door.
pic 2 pic 2 pic 2
Another skip is filling up. Garage no longer accessible internally. Garage.
pic 2   pic 2
New insulation on internal garage wall. New insulation on internal garage wall.
pic 2 pic 2 pic 2
Piles more rubbish outside. Rubbish outside. Twelve power sockets in shack alcove.
pic 2   pic 2
The old chimney space has been concreted. False ceiling to cover up burnt wood.
pic 2   pic 2
False ceiling to cover up burnt wood. Master switch and twelve power outlets in shack.
pic 2   pic 2
The new shack area with window and wall sockets. The new large door will go here.
pic 2   pic 2
Rear view ..... Ditto.....
pic 2 pic 2 pic 2
Corner in new shack. Old door to downstairs bedroom. More drilling in walls for cable runs.
pic 2 pic 2 pic 2
Two chimneys are being closed off. Looking from bathroom to old office area. Electricians tools ready for the next day.
...
Day 34: Thursday 11 July 2024
Outside View
pic 2 pic 2 pic 2
Outside front. Outside front. Garage and cement delivered for screed.
Garage
pic 2 pic 2 pic 2
Inside the garage. Inside the garage. Inside the garage.
pic 2 pic 2 pic 2
Inside the garage. Cement delivered for the screed. Piles of junk round the back to be collected.
Outside Back and Side
pic 2 pic 2 pic 2
Piles of junk still to be collected. Space where the large window/door will go. Space for the large window/door.
pic 2 pic 2 pic 2
Spaces for windows. Window for new shack. Blank.
New Shack Area
pic 2 pic 2 pic 2
New shack area : sockets on wall. New shack area : side window. New shack area : wall sockets.
pic 2 pic 2 pic 2
New shack area : wall sockets. New shack area : side window. New shack area : four cable feed-throughs.
pic 2 pic 2 pic 2
New shack area. New shack area : window out to garden. New shack area.
New Living Room
pic 2 pic 2 pic 2
New living room area. New living room area. New living room area.
pic 2 pic 2 pic 2
New living room area : looking towards shack New living room area. New living room area.
pic 2 pic 2 pic !
New living room area. New living room area : old bedroom door. Blank.
New Bath Room
pic 2 pic 2 pic 2
New bathroom. New bathroom. New bathroom.
pic 2 pic 2 pic 2
New bathroom. New bathroom. New bathroom.
pic 2 pic ! pic !
New bathroom. Blank. Blank.
Old Office area outside New Bath Room
pic 2 pic 2 pic 2
Old office area outside bathroom. Old office area : looking towards bathroom. Old office area outside bathroom.
pic 2 pic 2 pic 2
Old office area outside bathroom. Old office area outside bathroom. Mixer system for underfloor heating.
pic 2 pic 2 pic 2
Old office area outside bathroom. Old office area outside bathroom. Old office area outside bathroom.
New Kitchen
pic 2 pic 2 pic 2
New kitchen. New kitchen. New kitchen.
pic 2 pic 2 pic !
New kitchen. New kitchen. Blank.